INESC TEC
INESC TEC
INESC TEC
Search results for:
Filter your results

0 Search results

NantongSIM

INESC TEC

About the Project

SIMULATION OF THE GREENFIELD NANTONG COMPONENTS FACTORY

IKEA Components aims at building a new plant to make bags of components. One important characteristic of the plant is its high level of automation. AGVs, Forklifts and Workers, that move pallets around the plant, are then critical to ensure higher levels of efficiency and output. The challenge is to optimize the overall operation of the plant by ensuring a continuous material flow and a superior level of throughput.
Acronym

NantongSIM

Responsible

Paulo Sá Marques

Status

Closed

Starting Date

January 11, 2019

Ending Date

January 31, 2019

Effective End Date

January 31, 2019

Global Budget

--

Funding

--

Website

--

Datasheet

--