INESC TEC
INESC TEC
INESC TEC
Search results for:
Filter your results

0 Search results

MORA

INESC TEC

About the Project

Model for Operational Reserve Adequacy

The MORA project consisted of developing a simulation tool based on the sequential Monte Carlo algorithm to assess the adequacy of the static and the operatinal reserve of interconnected generation systems. This project arose from a request from the Portuguese transmission system operator, REN, to meet the new challenges in the electricity system arising from the integration of a greater volume of variable renewable power and the progressive interconnection of European networks.
Acronym

MORA

Responsible

Leonel Magalhães Carvalho

Status

Closed

Starting Date

January 5, 2016

Ending Date

January 31, 2018

Effective End Date

January 31, 2018

Global Budget

--

Funding

--

Website

--

Datasheet

--

Dissemination

INESC TEC has a unique and differentiating management model, improved over its 35 years of history. Reflecting its unique position between academia and industry, the management at INESC TEC carefully balances, in a hybrid model, the academic culture of scientific freedom and dialogue with a culture of efficiency and responsibility in management.